the problem
if we put thebug onto the scheme we can (when we put the electricity ) to measure valt and amper but not zeroes and 1
we can get this measures for the pentum
one-23456
parallel
-2
windows by
1- we load as little procedures /prat of this if possible to lad the part of the procedure=think
we load the little procedures and for this windows load and execute the tasks according to needs
weassume that to load covert execute convert load _new
from the beginning of the reciver cd player windows
\to load new track 0 to convert fron 0-1
ois recorded
to play i to covert 1-0 to load new go to the new trak and make the same
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment