Monday, September 25, 2017

the problem

if we put thebug onto the scheme we can (when we put the electricity ) to measure valt and amper but not zeroes and 1
we can get this measures for the pentum
one-23456
parallel
-2
windows by
1- we load as little procedures /prat of this if possible to lad the part of the procedure=think

we load the little procedures  and for this windows load and execute the tasks  according to needs

weassume that to load  covert execute convert  load _new

from the beginning of the reciver cd player windows

\to load new track 0 to convert fron 0-1
ois recorded
to play i to covert 1-0 to load new go to the new trak and make the same


No comments: